Fig. 1. — Erection of piers and pulleys and tying of ropes, for taking down the stone pillar.

Fig. 2 . — Pasheb on which the stone pillar would rest while taken down.

Fig. 3. — Erection of pulleys and raising the pillar in order to place it on the ladha (cart).

Fig. 4. — Arrival of the ladha with the stone pillar, at the bank of the Jamna river.

Fig. 5. — Constructing the foundations of a structure, 61 yards square thereon to set up the pillar.

Fig. 6. — Building of the first storey and raising the pillar on its top by means of ropes.

Fig. 7. — Plan of the second storey.

Fig. 8. — Raising the pillar two yards at a time, first at one end and then at the other.

Fig. 9. — Third storey of the structure on which the pillar was set up.